Main System 28 Eco Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Grzejniki wodne i kotły Main System 28 Eco. Main System 28 Eco Technical data Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - System Eco Elite

© Baxi Heating UK Ltd 2014Installation & Service InstructionsSystem Eco EliteRangeThese instructions include the Benchmark Commissioning Checklist

Strona 2 - Natural Gas

104.0 Technical Data© Baxi Heating UK Ltd 20144.1 System 24 & 28 Eco EliteFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase Dimens

Strona 3 - © Baxi Heating UK Ltd 2014

115.0 Dimensions and Fixings© Baxi Heating UK Ltd 2014Tap Rail360° Orientation Tube Ø 100mmDCBAFEGGHeatingReturn(22mm)HeatingFlow(22mm)Pressure Relief

Strona 4 - Legislation

126.0 System Details© Baxi Heating UK Ltd 20146.1 Central Heating Circuit1. The appliance is suitable for fully pumped SEALED SYSTEMSONLY. Treatment o

Strona 5 - Safe Manual Handling

136.0 System Details© Baxi Heating UK Ltd 20146.5 System Filling and Pressurising (Fig. 6) 1. A filling point connection on the central heating return

Strona 6 - CONTENTS

147.0 Site Requirements© Baxi Heating UK Ltd 20147.1 Location1. The boiler may be fitted to any suitable wall with the fluepassing through an outside

Strona 7 - 1.0 Introduction

157.0 Site Requirement© Baxi Heating UK Ltd 20147.3 Ventilation of Compartments1. Where the appliance is installed in a cupboard orcompartment, no air

Strona 8 - 2.0 General Layout

167.0 Site Requirements© Baxi Heating UK Ltd 20147.7 Condensate DrainFAILURE TO INSTALL THE CONDENSATE DISCHARGEPIPEWORK CORRECTLY WILL AFFECT THE REL

Strona 9 - 3.0 Appliance Operation

177.0 Site Requirement© Baxi Heating UK Ltd 20147.7 Condensate Drain (cont.)12. A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301. T

Strona 10 - 4.0 Technical Data

187.0 Site Requirements© Baxi Heating UK Ltd 20147.8 Flue (Figs. 17 & 18)NOTE: Due to the nature of the boiler a plume of watervapour will be disc

Strona 11 - Dimensions

198.0 Flue Options© Baxi Heating UK Ltd 20148.1 Horizontal Flue Systems1. The standard flue is suitable only for horizontal terminationapplications.2.

Strona 12 - 6.0 System Details

2© Baxi Heating UK Ltd 2014Natural GasMain System 24 Eco Elite G.C.No41 467 21Main System 28 Eco Elite G.C.No41 467 22© Baxi Heating UK Ltd 2014 All r

Strona 13

208.0 Flue Options© Baxi Heating UK Ltd 2014VerticalFluesVerticalFlues(Twin Pipe)(ii)(i)(ii)(i)8.2 Twin & Vertical Flue Systems1. Maximum permissi

Strona 14 - 7.0 Site Requirements

218.0 Flue Options© Baxi Heating UK Ltd 2014ABK,K1RDCNU,WSLHJMEGFP8.3 Flue AccessoriesA2Key Accessory Size Code NoFLUE GROUP AConcentric Flue System 1

Strona 15 - 7.0 Site Requirement

228.0 Flue Options© Baxi Heating UK Ltd 20148.4 Twin Flue Duct Adaptor1. The kit allows connection of a twin flue system to theboiler adaptor.8.5 Twin

Strona 16

238.0 Flue Options© Baxi Heating UK Ltd 2014Fig. 19100mm685mm8.6 For Roof Terminals1. In the case of a pitched roof 25 - 50 degrees, position the lead

Strona 17

249.0 Plume Displacement© Baxi Heating UK Ltd 20149.1 Plume Displacement Kit (Fig. 23)Kit No 5118638Content of kit1 0.9m 60/100 Concentric Flue1 1m 60

Strona 18 - Assembly

259.0 Plume Displacement© Baxi Heating UK Ltd 2014Concentric 60/100 Flue60Ø ExhaustXYFig. 26Fig. 27Flue Length - Worked ExampleMain System 28 Eco Elit

Strona 19 - 8.0 Flue Options

269.0 Plume Displacement© Baxi Heating UK Ltd 2014Min. 2 metresFig. 28Fig. 3330mm30mmFig. 30Fig. 32Fig. 31Adaptor50mmFlue TrimPosition of ‘Jubilee’ Cl

Strona 20

279.0 Plume Displacement© Baxi Heating UK Ltd 20149.3 General Fitting Notes (cont.)15. For aesthetic purposes it is permissible to route the60Ø exhaus

Strona 21

2810.0 Installation© Baxi Heating UK Ltd 201410.1 Unpacking & Initial PreparationThe gas supply, gas type and pressure must be checked forsuitabil

Strona 22

2910.0 Installation© Baxi Heating UK Ltd 201410.4 Fitting the Pressure Relief Discharge Pipe (Fig. 44)1. Remove the discharge pipe from the kit. 2. D

Strona 23

3Installer Notification Guidelines© Baxi Heating UK Ltd 2014Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Strona 24 - 9.0 Plume Displacement

3010.0 Installation© Baxi Heating UK Ltd 2014Slots at bottomCentralising CollarFig. 50Fig. 51Fig. 52Apply Lubricant forease of assembly.Ensure Flue is

Strona 25

3110.0 Installation© Baxi Heating UK Ltd 201410.7 Making The Electrical ConnectionsNOTE: Both the Live and Neutral connections are fused.To connect an

Strona 26

3211.0 Commissioning© Baxi Heating UK Ltd 2014PumpAutomatic AirVentPressure GaugeScrewbar01234Fig. 59Selector SwitchCentral Heating Temperature Contro

Strona 27 - 500mm Min

3311.0 Commissioning© Baxi Heating UK Ltd 2014Set Boiler to Maximum Rate(see 11.1.17)Allow the combustion to stabilise. Do not insert probe toavoid ‘f

Strona 28 - 10.0 Installation

3411.0 Commissioning© Baxi Heating UK Ltd 2014Selector SwitchDisplayResetbar01234Central Heating Temperature ControlCalibration ControlFig. 63Fig. 64F

Strona 29 - 100mm 685mm

3512.0 Completion© Baxi Heating UK Ltd 201412.1 Completion 1. Instruct the user in the operation of the boiler andsystem including external controls,

Strona 30

3613.0 Servicing© Baxi Heating UK Ltd 2014Case Front PanelFig. 69Facia Panel SecuringScrewsFig. 70Inner DoorPanelFig. 71CondensateTrapSump13 .1 Annual

Strona 31

3713.0 Servicing© Baxi Heating UK Ltd 201413.2 Annual Servicing - Inspection (Cont)6. Undo the nut on the gas pipe at the gas/air inlet (Fig. 72)and t

Strona 32 - 11.0 Commissioning

3814.0 Changing Components© Baxi Heating UK Ltd 2014IMPORTANT: When changing components ensure thatboth the gas and electrical supplies to the boiler

Strona 33

3914.0 Changing Components© Baxi Heating UK Ltd 201414.3 Fan 1. Undo the nut on the gas pipe at the gas/air inlet (Fig. 77)and the gas valve. Remove t

Strona 34

4Legislation© Baxi Heating UK Ltd 2014Codes of Practice - refer to the most recent versionThis company declare that no substances harmful to healthare

Strona 35 - 12.0 Completion

4014.0 Changing Components© Baxi Heating UK Ltd 201414.5 Burner (Fig. 80) 1. Undo the nut on the gas pipe at the gas/air inlet and thegas valve. Remov

Strona 36 - 13.0 Servicing

4114.0 Changing Components© Baxi Heating UK Ltd 201414.7 Safety Thermostat (Fig. 81)1. Pull the plug off the thermostat.2. Remove the screws securing

Strona 37

4214.0 Changing Components© Baxi Heating UK Ltd 201414.11 Heat Exchanger Automatic Air Vent (Fig. 84)1. Drain the boiler primary circuit and unscrew t

Strona 38 - 14.0 Changing Components

4314.0 Changing Components© Baxi Heating UK Ltd 201414.15 Pressure Gauge (Figs. 88 & 89) 1. Drain the boiler primary circuit and undo the nut

Strona 39

4414.0 Changing Components© Baxi Heating UK Ltd 201414.17 P.C.B. (Figs. 91 & 92)1. Note the settings of the temperature control knobs,rotate them

Strona 40

4514.0 Changing Components© Baxi Heating UK Ltd 201414.19 Gas Valve (Fig. 93)IMPORTANT: After replacing the valve the CO2must bechecked and adjusted a

Strona 41

46© Baxi Heating UK Ltd 2014Selector SwitchDisplayResetbar01234Central Heating Temperature ControlDomestic Hot Water Temperature ControlFig. 96Fig. 97

Strona 42

4716.0 Electrical© Baxi Heating UK Ltd 2014- brown- black- blue- whitebrbkbw- green- green / yellow- redgg/yr Control PCBX2 X3X9X5011 21 23344556789X1

Strona 43

4817.0 Short Parts List© Baxi Heating UK Ltd 2014Short Parts ListKey G.C. Description ManufacturersNo.No. Part No.A Fan 5121447B Electrode Assembly 51

Strona 44

4918.0 Fault Finding© Baxi Heating UK Ltd 2014NOTE: When instructed to turn theselector to the reset position turn theselector switch fully anticlockw

Strona 45

5Safe Manual Handling© Baxi Heating UK Ltd 2014GeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Strona 46 - 15.0 Setting the Gas Valve

5018.0 Fault Finding© Baxi Heating UK Ltd 2014Refer to Section 16.0 “Illustrated Wiring Diagram” for position of terminals and componentsCentral Heati

Strona 47 - 16.0 Electrical

5118.0 Fault Finding© Baxi Heating UK Ltd 2014Fault Finding Solutions SectionsIs there 230V at:Is there 230V at:Main terminals L and N Check electrica

Strona 48 - 17.0 Short Parts List

5218.0 Fault Finding© Baxi Heating UK Ltd 2014Gas at burnerEnsure gas is on and purgedReplace PCBReplace gas valvePCB - X3 connector is 230V AC across

Strona 49 - 18.0 Fault Finding

53© Baxi Heating UK Ltd 201418.0 Fault FindingKJLIs there 230V at:PCB - X3 connector terminals 5 & 6 central heating modeReplace PCBNOChange pump

Strona 50

*All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through aCompetent Persons Scheme. A Bui

Strona 51

www.centralheating.co.ukIt is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed

Strona 52

© Baxi Heating UK Ltd 2014Comp No7210844 - 05 (09/14)All descriptions and illustrations provided in this leaflet have beencarefully prepared but we re

Strona 53

6© Baxi Heating UK Ltd 2014CONTENTS1.0 Introduction 72.0 General Layout 83.0 Appliance Operation 94.0 Technical Data 105.0 Dimensions and Fixings 116.

Strona 54

71.0 Introduction© Baxi Heating UK Ltd 20141.1 Description1. The Main System Eco Elite is a fully automatic gas fired wallmounted condensing system bo

Strona 55 - SERVICE RECORD

82.0 General Layout© Baxi Heating UK Ltd 20142.1 Layout1. Expansion Vessel2. Automatic Air Vent3. Primary Return Temperature Sensor4. Circulation Pump

Strona 56 - Website www.mainheating.co.uk

93.0 Appliance Operation© Baxi Heating UK Ltd 20141 2 4 5 6 7

Komentarze do niniejszej Instrukcji

Brak uwag