Main Combi 24 HE Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Grzejniki wodne i kotły Main Combi 24 HE. Main Combi 24 HE Technical data [en] [fr] [it] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - Baxi Platinum Combi HE Range

Please leave these instructions with the userBaxi Platinum Combi HE RangeGas Fired Wall Mounted CondensingCombination BoilerInstallation & Servici

Strona 2 - Natural Gas

104.0 Technical Data4.2 Platinum Combi 28 HEFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase DimensionsCasing Height - 780mmOverall He

Strona 3

114.0 Technical Data4.3 Platinum Combi 33 HEFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase DimensionsCasing Height - 780mmOverall He

Strona 4 - Legislation

125.0 Dimensions and FixingsDimensionsA 780mmB 345mmC 450mmD 116mm Ø Min.E 185mmF 145mmG 131mmH 180mmDomestic Hot Water Outlet(15mm)Cold WaterInlet(15

Strona 5 - CONTENTS

136.0 System Details6.1 Information1. The Baxi Platinum Combi HE Condensing Combination Boileris a ‘Water Byelaws Scheme - Approved Product’.To compl

Strona 6 - 1.0 Introduction

146.0 System Details6.5 System Filling and Pressurising1. A filling point connection on the central heating returnpipework must be provided to facilit

Strona 7 - 2.0 General Layout

156.0 System Details6.8 Domestic Hot Water Circuit (Fig. 7)1. All DHW circuits, connections, fittings, etc. should be fullyin accordance with relevant

Strona 8 - 3.0 Appliance Operation

167.0 Site Requirements7.1 Location1. The boiler may be fitted to any suitable wall with the fluepassing through an outside wall or roof and dischargi

Strona 9

177.0 Site Requirement7.3 Ventilation of Compartments1. Where the appliance is installed in a cupboard orcompartment, no air vents are required.2. BS

Strona 10 - 4.0 Technical Data

187.0 Site Requirements7.6 Condensate DrainFAILURE TO INSTALL THE CONDENSATE DISCHARGEPIPEWORK CORRECTLY WILL AFFECT THE RELIABLEOPERATION OF THE BOIL

Strona 11

197.0 Site Requirements7.7 FlueNOTE: Due to the nature of the boiler a plume of watervapour will be discharged from the flue. This should betaken into

Strona 12 - Dimensions

2Natural GasBaxi Platinum Combi 24 HEG.C.No47 075 20Baxi Platinum Combi 28 HEG.C.No47 075 21Baxi Platinum Combi 33 HEG.C.No47 075 22Building Regulatio

Strona 13 - 6.0 System Details

207.0 Site Requirements7.8 Flue DimensionsThe standard horizontal flue kit allows for flue lengths between100mm and 685mm from elbow to terminal (Fig.

Strona 14

217.0 Site Requirements7.11 Flue Options1. The Baxi Platinum Combi HE can be fitted with fluesystems as illustrated. 2. The standard flue is suitable

Strona 15

228.0 Installation8.1 Initial PreparationThe gas supply, gas type and pressure must be checked forsuitability before connection (see Section 7.4).1. A

Strona 16 - 7.0 Site Requirements

238.0 Installation8.4 Fitting the Filling Loop1. The filling loop supplied with the boiler can be connected tothe taps on the wall plate at this point

Strona 17 - 7.0 Site Requirement

248.0 Installation8.5 Fitting The Boiler1. Remove the sealing caps from the boiler connections.2. Lift the boiler using the lower edges. Engage the sl

Strona 18

258.0 Installation8.8 Fitting The FlueHORIZONTAL FLUE1. The standard flue is suitable for lengths between 100mmminimum and 685mm maximum, as measured

Strona 19

268.0 Installation8.8 Fitting the Flue (Cont)5. Mark dimension ‘Y’ on the flue as shown (Fig. 23).Carefully cut the waste material from the flue, ensu

Strona 20

278.0 Installation8.9 Making The Electrical ConnectionsTo connect the mains input cable proceed as follows:-1. Slacken the facia panel securing screws

Strona 21

289.0 Commissioning9.1 Commissioning the Boiler1. Reference should be made to BS 5449 Section 5 whencommissioning the boiler. 2. Open the mains water

Strona 22 - 8.0 Installation

299.0 Commissioning9.2 Setting the TimerThe Electro-Mechanical Timer allows the central heatingsystem to be set every 15 minutes.Using the three posit

Strona 23

3Installer Notification GuidelinesChoose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building Control(LABC) who will arr

Strona 24

309.0 Commissioning9.3 Checking1. The gas valve is factory set and the burner pressure cannotbe measured as it is altered by suction of the fan andmod

Strona 25

3110.0 Completion10.1 Completion 1. Instruct the user in the operation of the boiler andsystem including the integral timer, explaining theoperational

Strona 26

3211.0 Servicing11 .1 Annual Servicing1. For reasons of safety and economy, it is recommended thatthe boiler is serviced annually.Servicing must be pe

Strona 27

3311.0 Servicing11.1 Annual Servicing (Cont)7. Undo the nut on the gas inlet pipe to the venturi (Fig. 42)and pull the sensing pipe off the fan.8. Dis

Strona 28 - 9.0 Commissioning

3412.0 Changing ComponentsIMPORTANT: When changing components ensure thatboth the gas and electrical supplies to the boiler areisolated before any wor

Strona 29 - GRASSLIN

3512.0 Changing Components12.3 Fan (Fig. 48)1. Undo the nut on the gas inlet pipe to the venturi (Fig. 49)and pull the sensing pipe off the fan.2. Dis

Strona 30

3612.0 Changing Components12.6 Burner (Fig. 51) 1. Undo the screws securing the collector to the venturi andextension piece. Remove this extension pie

Strona 31 - 10.0 Completion

3712.0 Changing Components12.8 Flue/Heat Exchanger Thermostat Sensor (Fig. 53)1. Ease the retaining tab on the sensor away and disconnectthe electrica

Strona 32 - 11.0 Servicing

3812.0 Changing Components12.13 Pump - Head Only (Fig. 56)1. Drain the primary circuit and remove the socket headscrews securing the pump head to the

Strona 33

3912.0 Changing Components12.16 Pressure Gauge (Figs. 59 & 60) 1. Drain the primary circuit and undo the nut on thepressure gauge capillary.2

Strona 34 - 12.0 Changing Components

4LegislationCodes of Practice - refer to the most recent versionIMPORTANT - Installation, Commissioning, Service & RepairThis appliance must be in

Strona 35

4012.0 Changing Components12.19 Plate Heat Exchanger (Fig. 63)1. Drain the primary circuit and remove the gas valve asdescribed in section 12.23.2. Wh

Strona 36

4112.0 Changing Components12.21 P.C.B. (Fig. 67)1. Note the settings of the temperature control knobs,rotate them fully anticlockwise and carefully pu

Strona 37

4212.0 Changing Components12.23 Gas Valve (Fig. 68)1. Turn the gas cock off and undo the nut on the gas feedelbow under the boiler.2. Remove the screw

Strona 38

4313.0 Combustion Check13.1 Checking the CO21. The combustion (CO2) may be checked using a suitablycalibrated analyser after running the boiler for se

Strona 39

4414.0 Electrical- brown- black- blue- whitebrbkbw- green- green / yellow- redgg/yr Control PCBX2 X3X9X5011212 3344556789X112DHW NTC SensorReset Selec

Strona 40

4515.0 Short Parts ListShort Parts ListKey G.C. Description ManufacturersNo. No. Part No.311 Fan 5114684426 Motor 3way Valve 248733315 Igniter Electro

Strona 41

4616.0 Fault FindingNOTE: When instructed to turn theselector to the reset position turn theselector switch fully anticlockwise againstthe spring pres

Strona 42

4716.0 Fault FindingRefer to Section 14.0 “Illustrated Wiring Diagram” for position of terminals and componentsCentral Heating - Follow operational se

Strona 43 - 13.0 Combustion Check

4816.0 Fault FindingTurn selector switch to The display illuminatesError 20, 28 or 50 flashingError 119 flashingBurner lightsError 110 flas

Strona 44 - 14.0 Electrical

4916.0 Fault FindingFault Finding Solutions SectionsIs there 230V at:Is there 230V at:Main terminals L and N Check electrical supply1.NOMain terminal

Strona 45 - 15.0 Short Parts List

5CONTENTS1.0 Introduction 62.0 General Layout 73.0 Appliance Operation 84.0 Technical Data 95.0 Dimensions and Fixings 126.0 System Details 137.0 Site

Strona 46 - 16.0 Fault Finding

5016.0 Fault FindingTemperature sensors faulty.Cold resistance approximately10kΩ @ 25° C (DHW and CH sensors)20kΩ @ 25° C (Flue sensor)(resistance red

Strona 47

5116.0 Fault FindingCheck and correct if necessary1. The mechanical set of the gas valve(CO2 values - see instruction)2. Flame sensing electrode and l

Strona 48

5217.0 Notes

Strona 49

5317.0 Notes

Strona 50

1 11.0 IntroductionCONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxesTIME & TEMPERATURE

Strona 51

55SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.CORGI ID CARD SERIAL No.COMMENTSSIGNATURESERVICE 2DATEENGINEER NAMECOMPANY NAMETEL No.CORGI ID CARD SER

Strona 52 - 17.0 Notes

Comp No5116280 - Iss 2 - 11/05Baxi Heating UK LimitedBrownedge Road Bamber Bridge Preston Lancashire PR5 6UPAfter Sales Service 08700 60 30 60 Technic

Strona 53

61.0 Introduction1.1 Description1. The Baxi Platinum Combi HE is a fully automatic gas firedwall mounted condensing combination boiler. It is room sea

Strona 54 - COLLECTIVE MARK

72.0 General Layout2.1 Layout1. Expansion Vessel2. Automatic Air Vent3. DHW Plate Heat Exchanger4. Circulation Pump5. Drain Off Point6. Pressure Relie

Strona 55 - SERVICE INTERVAL RECORD

83.0 Appliance Operation3.1 Central Heating Mode (Fig. 2)1. With a demand for heating, the pump circulates waterthrough the primary circuit.2. Once ma

Strona 56 - Website www.baxi.co.uk

94.0 Technical Data4.1 Platinum Combi 24 HEFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase DimensionsCasing Height - 780mmOverall Hei

Komentarze do niniejszej Instrukcji

Brak uwag